Detailed design study of third section of Arak-Khomein -Golpayegan -Isfahan Railway

Iran Railway Development Consulting Engineers Company (Metra)

Project details

Project location From the end of Khomein city station to the beginning of Khansar city station
Project status In progress
Consultant Employer Consultant: Metra Consulting Engineers
Control System -----
Project Owner Company for the construction and development of the country's transport infrastructure
Project Contractor -----
Date & Duration of the Contract August 2019

Project Description

Contract for detailed studies of the third section of the Arak-Khomein-Golpayegan-Isfahan railway in 1398 between Metra Consulting Engineers Company and the construction and development company of the country’s transport infrastructure to reduce the length of trains from Kermanshah to Arak and finally Isfahan and the center of the country. The opposite was concluded.

Plan Objectives

Connecting the west of Iran Railway to the central railway network to decrease the route from Kermanshah to Arak and finally to Isfahan and the center and the reverse. ( a short cut ) 

Description of Metra Consulting Engineers Services

Carrying out detailed design studies for the third section of the Arak-Khomein-Golpayegan-Isfahan railway

Project features

Project Length: 40 km

3 stations (Golpayegan, location of Saeedabad petrochemical station and industrial city and Saeedabad city passenger stop)

Changing the corridor of basic design studies by this consultant led to the elimination of 2 km of tunnels, the removal of special valley bridges, the reduction of earth operations volumes and the optimization of the route.