Mechanized Tunnel of the Islamshahr Metro

Iran Railway Development Consulting Engineers Company (Metra)

Project details

Project location Along Ayatollah Saeedi Highway ,adjacent to Azadegan Highway
Project status in progress
Consultant -------------
Control System Metra Consulting Engineers
Project Owner Islamshar Municipality
Project Contractor Contractor Khatam-Al-Anbya Construction Headquarters -Harra Institute
Date & Duration of the Contract Jan.2019for 36 Months

Project Description

The contract of mechanized tunnel of Tehran-Islamshahr metro project with a length of 9.5 km was concluded between Metra Consulting Engineers Company and Islamshahr Municipality in 2011. The investor of this project is from the internal resources of Islamshahr Municipality.

The location of this project is 620 meters after the end of the Azadegan Station and the Central Workshop and the portal shaft along the Ayatollah Saeedi highway, along with approx. 9.5 kilometers of tunnel to Namaz Square in Islamshar. One of the highlighted points of the mechanized tunnel project is 14,60720 hours of operation or 855 days without any accidents(reported by the HSE expert) by May 2021.

Plan Objectives

Completion and Southern expansion    Tehran Line 3 Metro  to Islamshahr and provide access for  passengers in Islamshahr  and suburbs to Tehran subway lines

Service Descriptions of Metra Consulting Engineers

The contract for Supervision services of Mechanized tunnel and entry and exit and the backup shafts for Tehran-Islamshar Metro Lines 

Description of Metra Consulting Engineers Services

Contract for high supervision services and workshop for implementation of mechanized tunnel and inlet, outlet and support shafts of Tehran-Islamshahr metro line

Project features

The first and second section of the Islamshahr Metro project will connect the Azadgan Station to Namaz Square in Islamshar  field. The third section  is 5 kg which is between Namaz Square and Ghaem Station .

The second section goes through the entry shaft up to Namaz Square which includes entry , exit and backup shafts

The total length of the route is 15.5 km and continues Ghaem square in Islamshar ,it includes 5 stations ,entry and exit shafts of TBM and thirteen mid-tunnel ventilations