Railway Mianeh – BostanAbad –Tabriz

Iran Railway Development Consulting Engineers Company (Metra)

Project details

Project location East Azarbaijan Province ( Mianeh- BostanAbad –Tabriz)
Project status From Mianeh to BostanAbad Station has been opened – the rest of the route is in progress
Consultant -------
Control System Metra Consulting Engineers Company
Project Owner Construction and Development of Transportation Infrastructures Company
Project Contractor Ballast Railway and facilities engineering company
Date & Duration of the Contract The section of Mianeh BostanAbad in 2016- and Section Bostan Abad Shahgoli Pool ( Tabriz) in 2020

Project Description

 

the Contract for the materials provision and implementation of Mianeh –Bostan Abad –  Shahgoli Pool ( Tabriz)   Railway Axis – between the Metra Consulting Engineers Company and  Construction and Development of Transportation Infrastructures Company was concluded  in order to realize the following goals:

Quick and easy access to Tehran in the northwestern parts of the country by reducing the connection of Tabriz to the railway network by 100 km

Distribution, load displacement, cheap transport, increased safety, reduced road traffic volume

Decreased by 114 kilometers of old Railway Tehran – Tabriz with the construction of the Middle project – Tabriz

Plan Objectives

  1. Reduced 100 kilometers length of the connection of East Azarbaijan province to the country’s rail network
  2. Decrease 114 kilometers of Tehran old railway with the construction of the Mianeh- Tabriz project
  3. Distribution, load displacement, cheap transport, increased safety, reduced road traffic volume
  4. Increased transit of goods from domestic production centers to consumer markets in Asian and European countries through boundary terminals according to the geographical location of the province

Description of Metra Consulting Engineers Services

– Planning services, Determination of work implementation, Control progress
– Engineering services
– Coordination services, executive, temporary delivery
– Quality control services
– Estimation services, controlling payments and costs, legal affairs of contracts
– Services and definitive delivery instructions and delivery guidelines
2- High Supervision Services

Project features

The section of Mianeh BostanAbad in 2016- and Section Bostan Abad Shahgoli Pool ( Tabriz) in 2020 

 

The duration of contract in Mianeh –BostanAbad Section ( including the extension) 56 months

The Duration of contract for Bostan Abad – Shahgoli Pool ( Tabriz) : 15 months

The length of the project : 183 km is the length of the route and 34.5 km is the length of station lines

The number of stations : 10 stations

 

Description :

The first phase from Mianeh to Bostan Abad with 4 stations and 133 km has been opened and in the second phase, the distance from Bostan Abad to Khavaran with a length of 44 km and 2 stations will be put into operation soon.
The Mianeh- Bostan Abad Tabriz is the first project used by national production rails (60E1).

Related projects