Transfer of Tehran-Tabriz Railway to the Underground

Iran Railway Development Consulting Engineers Company (Metra)

Project details

Project location Tehran-Tabriz railway route in the area before Navab bridge to before Kan bridge
Project status In Progress
Consultant Metra Consulting Engineers
Control System -----
Project Owner Islamic republic of Iran Railway
Project Contractor Khatam Al-Anbia (PBUH) Construction Camp - Shahid Rajaei Institute
Date & Duration of the Contract 2017

Project Description

Plan Objectives

1.Transfer of the railway route to the basement
Helping to rebuild worn-out urban fabric and improve urban services to the citizens of Districts 17 and 18
2.Reducing barriers to urban development in areas 17 and 18
3.Reduce urban traffic restrictions
4.Reduce accidents of pedestrians and road vehicles colliding with rail vehicles
5.Reduce environmental pollution
6.Enabling the future development of Tabriz’s rail transportation
7.Help improve the quality of existing railways

Description of Metra Consulting Engineers Services

Planning, job referral, study and design management, logistics management, construction and installation and ancillary services, quality management, time management, cost management, safety management, contract management, delivery management and commissioning services, documentation, evaluation And evaluation, information, expert review and comment on non-transferable duties

Project features

Project Status: Ongoing
Start date: 2007
Project length: 10 km
Number of tunnels: 1
Maximum length of the tunnel: 8 km
Tunnel execution method: cut & cover
Description: The construction of the tunnel structure was completed in 2014 and is being operated by the Railway Company. Currently, the project facilities are being implemented and the ancillary structures are being completed.
The beginning of the route between Qaleh Marghi Street and before Nourd Street and also the end of the route has been implemented as a ramp.